Glenwood Springs has received an overnight total of 8” of snow at the south yard and 4” at the top of Traver Trail with more snow falling still. Please take extra time when driving as streets are extremely icy and snow-packed in areas. City Streets crews have been plowing since 2:30 a.m. and de-icing roads and will be out all day performing removal operations with Gould Construction assisting with removal operations throughout town.